Operational
PLG Assembly Line 1
Launched production line.

Process control & capacity
Structured assembly, controlled material flow and staged production capacity for automotive programs.
Production-line overview
Line 3 is a planning item. It is not included in any current-capacity statement and remains visibly labeled as planned.
Operational
Launched production line.
Operational
Launched production line.
Planned
Capacity planning visual; not an installed line.
Controlled material flow
Marketing visuals clarify the intended process direction; they are not evidence of a specific production lot or shipment.
Dimensional and condition review before controlled entry.
Structured component assembly through the defined process.
Functional checks within the production flow.
Protective packing and finished-goods preparation.
Warehouse staging and program coordination.



Facility layout
Explore how machining, assembly and storage are arranged across the facility.

Fifth floor
Storage for components used in the production flow.
Fourth floor
Component storage supporting assembly and material supply.
Third floor
Product assembly and office space for program coordination.
Second floor
Storage for completed products and protective packaging supplies.
Ground floor
Component machining, measurement and laboratory work.
Factory and program reviews can focus on the relevant engineering workflow, inspection approach, material movement, traceability and production-line status.